Skip to main content

New announcement. Learn more

TAGS

NSW Coal Port Shiploader Project

Major shutdown projects demand containment systems that can perform in harsh industrial environments while supporting safe, efficient maintenance works. This project at a NSW Coal Port shiploader involved blast and paint works alongside structural remediation, requiring a fully enclosed system capable of withstanding both the elements and the demands of a large-scale industrial site.

Shrink Safe supplied a complete containment solution using Safe Seal Fire Retardant (FR) Wrap, supported by Safe Seal Tape, Zipper Doors, and an innovative Geo Membrane Flooring System. Together, these products created a fully encapsulated environment that allowed crews to safely carry out blasting, painting, and structural repairs while maintaining complete containment throughout the project.

The installation incorporated more than 400 tonnes of scaffold and 6,460 m² of Safe Seal Wrap, creating a robust enclosure that remained secure in winds of up to 90 km/h over the course of the three-month shutdown. The combination of high-performance materials and quality installation ensured the project remained on schedule while protecting both workers and the surrounding environment.

Projects like this demonstrate the versatility and performance of the complete Safe Seal containment system. From fire-retardant shrink wrap and tape to access solutions and flooring, every component is designed to work together to create reliable, weatherproof containment for Australia's most demanding industrial projects.

At Shrink Safe, we're proud to supply next-generation containment solutions that help contractors deliver safe, efficient, and dependable outcomes on projects where performance simply can't be compromised.



 

This product has been added to your cart

CHECKOUT